Course Work for Construction Civil Engineering

User Generated

nuzrq_ynvgu

Engineering

Description

the company is CCC "Consolidated Contractors Company" in Oman, not H a s s a n C o n t r a c t i n g L L C, you will understand this when you'll read the task in the attached file, I want this Course work with 0% plagiarism "no similarity", thanks.

Unformatted Attachment Preview

CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 Department of Civil Engineering Civil Engineering Construction 1 CIVIL 0003 Coursework Group Assignment Submission Date: 28/04/2018 1 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 OBJECTIVES: As a civil engineering student in Oman it is very important to increase ones knowledge on the subject of construction equipment and methods. Through investigation on the local applications and costs of existing construction equipment in Oman students will be familiar with the local application of these instruments and also common problems that occurs in Oman while using these equipment. Therefore they will be able to put this knowledge in practice later in their career to select the appropriate equipment that meets the purpose required to solve a specific problem on construction sites. OUTCOMES: Apply the knowledge gained above to develop safe and sustainable solutions to site situations; Appraise the solutions developed above to propose the most desirable solution in the circumstances Present the solutions in a form which could be understood and acted on by site personnel TASKS Consider you are working in H a s s a n C o n t r a c t i n g L L C . , a medium s i z e contracting firm which has about five years of experience in executing various projects in Oman. Your company is planning to buy/rent the following list of construction equipment to improve the mobilization of a new construction project which is construction of a residential apartment with eight story building, the area includes hard soil and rocks, and the site is located with buildings surrounded. The project time-frame is fixed and format of the contract obligates your company to complete the work on the specific date otherwise you will face severe financial penalties also managing to control cost. Duration to complete all construction activities of the project is 15 months. The expected time for completing excavation is two months. (Further details of the project may be assumed in order to provide justification for the selection of equipment.) a. Machinery for earthwork excavation b. Trucks for earth moving c. Earth compacting machineries d. Cranes You are working as project manager and your senior has asked you to select two major models used in Oman for each of the above equipment and do perform the following. 2 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 1. Introduce the Selected equipment in minimum two models for each equipment 2. Critically evaluate all major performance criteria of equipment selected in each group with justification. 3. Add the values for criteria discussed in previous part for each model and demonstrate the differences between the models in each category 4. Provide the present price data for both purchase and rental of equipment. (Data must be accurate, Relevant and based on evidence) – you can show the price of rent/purchase of the two models from different suppliers to later justify the selection of one over another 5. Recommend which machine to be selected for this project and justify major factors that influence the choice of equipment. (Base on the information given in scenario and other assumptions regarding the project by student). One major factor of selecting the equipment is cost; therefore you must also make decision based on this factor and then justify the preference of rent or purchase of the chosen equipment. 6. Moreover investigate on applications of the chosen equipment is required in the local construction industry. You must explain how they are used in real life situation i.e., construction site. Report and describe your observations of the local applications of this equipment in Oman. Moreover state one specific problem that is common in application of this machine in Oman and discuss the possible solutions. You must provide evidence to support your observations. Instructions Choose a specific machine from one production but different models (e.g. excavator, Caterpillar , model A-2012 and model B-2013) or choose one machine from two different production but with similar applications (e.g. bulldozer JCB S130LC model and Bulldozer Komatsu D65EX ) . Caterpillar produces different models of excavator you can identify the differences between the models or similar model of a plant in different making like Caterpillar and Komatsu. You can review the brochures, and catalogues of companies that produce and sell machinery online or through contacts in contractor or consultant offices, business owners and construction sites. Add figures where ever applicable. In order to find out about costs you can contact contractors, companies or individuals who own or offer the plants for rentals or purchasing in Oman. Recommend which machine to be selected and justify major factors that influence the choice of equipment. This should be based on the information given about the site and your other assumptions (add the plan of the site). You must support your writing with regards to factors 3 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 you selected for each machine. Provide reasons why they are relevant to this equipment, scenario, etc. You must make effort to visit construction sites that are using the equipment to understand the actual application, advantages, challenges and solutions that are used in the local construction industry with regard to the equipment Next step is to put this information into a report format. You must use your writing skills to compose an essay. An essay must have introduction, the main part or the body. For task 4 it is suggested to prepare tables with proper referencing Guidelines Follow the guidelines mentioned below for your assignment. Assignment should have a Title Page. Title Page should contain the following information. Assignment Name Session Student name Student ID Referencing Students must refer to Student Handbook for refereeing method preferred in Middle East College (Preferred method in MEC is CU Harvard style) Important notification Note that mark is given to quality of writing and just by completing the writing you will not be entitled to full mark of that part In case your report covers the relevant areas with better quality the possibility of receiving a higher mark increases Avoid using irrelevant and general websites. Avoid using Google translator. Your assignment is a report therefore high degree of your mark depends on the quality of language ofyour writing. Avoid using Google translator. You can use the support of academic writing unit in language center to enhance your report in grammar, vocabulary; referencing, etc. also note that they conduct workshops from time to time in these subjects. Pay great attention to the referencing, MEC preferred method of referencing is CU Harvard. 4 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 Work and Safety Notes:  You are advised to visit construction project sites and discuss with the project team to collect the required information.  Visit the equipment dealers and discuss with them for understanding the plants and to collect the details and price list for purchase and rental.  Do not place yourself or others in hazardous situations  Use proper PPEs during your site visit and maintain safety at site. Coursework Proposal You must prepare and submit your CW proposal through the Moodle two weeks after the assignment is given to you. Proposal includes 5% of the mark. This proposal must contain the following: Title of the Assignment, Module Name and Title and Semester (Spring 2018) Information regarding your group members Explanation of your understanding about the project and tasks you shall carry out Project program (time schedule) Task allocation among the group members (you may be also specifically evaluated based on your individual responsibilities within your group) See the FORMAT of the proposal in the Assignment Important note: Students must note that Marks for the assignment will depend only on the presentation (viva). Viva is compulsory and NO marks will be awarded to the assignment if student does not appear in the viva on the specified date. This means that in the presentation day if the student fails to explain properly about his/her role in the work, he/she will get zero mark. Moreover students must submit a coursework proposal to show their understanding about deliverables/ time lines, etc. To assess individual work of each student a viva factor mark will be given to student’s performance in viva session. Students must demonstrate adequate knowledge and explain accurately about all parts of project and particularly about their role in the project. Note that final report mark will be adjusted using Viva Factor to incorporate every student’s individual contribution to the group work 5 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 Proposal Format Note that your proposal must cover the following: 1. Minimum one page explanation of your understanding from this task. You need to explain what you are going to write, which parts does your writing include and how you are going to complete each part. 2. Prepare a plan/program for your coursework, explain your plan and also demonstrate by using graphics (specify dates) 3. Distribute responsibilities that are based on your plan among your group members Follow the guidelines mentioned below during writing your report: The report should have a Title Page. Title Page should contain the following information. Title Class Student name Student ID Use page numbers Use your own words on writing, Times New Roman font size 12 Heading should be with Font Size 14, Bold and Underline Report Format Number of pages: Minimum 20 pages excluding references list and the appendix (if any) Line spacing and Font: Generally use Times New Roman 1.5 x line spacing. Start with the title page (including your name) or student number as requested. It is preferable to place figures within the text rather than group them at the end of the report. Give a sequential number to all figures (Fig. 1, Fig. 2, Fig. 3, etc.) Add a brief, informative caption to the figures. The Report should contain the following sections: Table of contents Introduction Report body References 1. Table of content Include heading, subheading, and page numbers. 2. Introduction (maximum three paragraphs) Briefly outline the report content, and describe how the report is organized. 6 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 3. Performance criteria of equipment First Introduce the Selected equipment in two models for each equipment .Then write and discuss about the performance criteria of equipment such as quantity of material to be moved, available time to complete the work, multiple usages with different attachments, engine power, specifications of the machine, work efficiency, quality, etc. provide justification for selection of these criteria. Then you must critically evaluate all major performance criteria of equipment selected in each group and compare between the two models by minimum four essential performance criteria. 4. Purchase / Rental of equipment Discuss the economic aspects which are beneficial for the company to choose either purchase or rental of equipment. Provide detail information with regards to price of purchase or rent of the two models in each group. Support your data with evidence. 5. Choice of equipment Write and discuss about the choice of equipment based on the suitability to the project provided in the scenario, availability of the equipment, costs, present market, or any other factor that you find relevant. (You can create more assumptions with regard to project to create justification for your choices of equipment). Example of factors: type of material to be handled, distance of site to important locations, geography of the site and volume of equipment to be handled, etc. (add the plan of the site). Note that cost and availability for rent or purchase is an important factor in making this decision. Note that you must justify the relevance of the major factors you selected for making your decision. You must provide reasons why this major factors influence the choice of equipment.( you must consider the current local situations in the industry and market) 7. Local application of equipment Include your observation of the actual application and performance of the equipment on the construction sites. Discuss some of the common problems and possible solutions. Support your observations with evidence. 7. References (Minimum 15 references) This is a list of all the sources of information you have referred to in the report. 8. Appendix Any additional figures, tables, and photos if required Late Submission Penalty for late submission - 5% of the maximum mark specified for the assessment will be deducted for each working day. Assessment documents submitted beyond a period of two classes after the last date of submission will not be accepted and will be marked as zero for that assessment Plagiarism Policy 7 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 As per MEC policy, any form of violation of academic integrity will invite severe penalty. Plagiarised documents, in part or in whole, submitted by the students will be subject to this policy. A. First offence of plagiarism a. A student will be allowed to re-submit the assignment once, within a maximum period of one week. However, a penalty of deduction of 25% of the marks obtained for the resubmitted work will be imposed. b. Mark deduction: When the work is resubmitted, the marking will be undertaken according to the marking criteria. In compliance with this policy, the 25% deduction is then made on the marks obtained. For example, in an assessment that carries a maximum of 50 marks, suppose a student were to obtain 30 marks for the resubmitted work, the final marks for that assessment will be 22.5 (after deducting 25% of the marks actually obtained for the resubmitted work). c. Period of resubmission: The student will have to resubmit the work one week from the date he or she is advised to resubmit. For example, if the formal advice to resubmit was communicated to the student on a Sunday (latest by 5 pm), the student will have to resubmit the work latest by next Sunday 5 pm. d. If the re-submitted work is also detected to be plagiarized, then the work will be awarded a zero. e. Resubmission of the work beyond the maximum period of one week will not be accepted and the work will be awarded a zero. B. Any further offence of plagiarism a. If any student is again caught in an act of plagiarism during his/her course of study (either in the same module, same semester or in any other semester), the student will directly be awarded zero for the work in which plagiarism is detected. In such cases, the student will not be allowed to resubmit the work. ASSESSMENT:  50% OF FINAL MARK Assessment Sheet – Basic Assignment Analysis: 8 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 Task Outstanding Excellent Very Good Quality Good (Acceptable) (  91%) (84 – 90) % (77-83)% (70-76)% Adequate/ Satisfactory Failed Below 50 (50-69)% Report Format Information is very organized with wellconstructed paragraphs ,subheadings, times new roman , 12 font size ,spacing 1.5 ,pages numbered ,table and figure named All topics are addressed and all Introduction tasks answered with sufficient detail and examples. Project life cycle concept stage All information required for every stage are provided and explained. In detail Information is very organized with Information is organized well-constructed with well-constructed paragraphs and paragraphs. subheadings. All topics are addressed and most tasks answered with at least minimal detail and at least one example All information required for every stage are provided and explained. In detail All topics are addressed and most tasks answered with less detail - and at least one example. All Information provided that is sufficient to repeat the study, but more explanation is needed (e.g., explanation of price estimate for every stage). Information is organized, but paragraphs are not well-constructed. All tasks are addressed, and most questions answered detail is lacking Most information correct, but some information may be missing or inaccurate. Very weak report format with no table of content ,very less The information spacing ,not appears to be followed the disorganized. instruction given in CW One or more task were not addressed. Much information missing and/or inaccurate. Very weak analysis or Weak understanding and exposition of relevant topic A few relevant points but superficial/co nfused No grasp of analysis and many errors CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 Process of cost budget for the project Conclusion References Very well the project estimate has been presented with all the detailed requirement Detail objectives from course work, the student addresses what they learned, how they learned it, and what is next with regard to learning, for this domain has been provided All sources (information and graphics) are accurately documented in the desired format. Some items are missed out in the project estimate Some result and discussion of student learning student learning objectives from course work, the student addresses what they learned, how they learned it, and what is next with regard to learning, for this domain has been provided All sources (information and graphics) are accurately documented, but a few are not in the desired format. Project price estimate presented will few mistakes Reasonable Project price estimate presented, but not as per requirement The written Using student learning information either objectives from course what they learned, how work, the student addresses they learned it, and/or either what they learned or what is next, for this how they learned it for this domain, but does not domain, and does not tie the learning to address plans for future objectives from course learning work Adequate referencing. All sources (information Appropriate and graphics) are referencing style used accurately documented, but may contain some but a few are not in the inaccuracies desired format. Reasonable cost estimates presented No or totally erroneous cost estimates presented. The written No conclusion information provided provided does not reference student learning objectives from course work, and does not address what they learned, how they learned it, or what is next, for this domain Poor and no references Some sources are not accurately documented. CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 Student Id: ______________ Student Name: _______________________________ Assignment Evaluation Grid: Outstanding Task (  91%) Excellent Very Good (84 – 90) Quality % (77-83)% Good (Acceptable) Adequate/ Satisfactory (70-76)% (50-69)% SL NO Failed Below 50 MAX MARKS REPORT - contents & writing 1 Introduction 4 2 Evaluating all major performance criteria of equipment. 10 3 4 Justification about major factors influence the choice of equipment Comparison of major two models in each group of equipment by minimum four essential criteria – with values 10 16 OBTAINED MARKS CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 5 6 7 8 Make proper selection of equipment supported by relevant reasoning and justification 22 Providing the present price data for purchase and rental of equipment, justifying the preference of equipment model for purchase / rental to your company. Proper report of observation of actual performance of the equipment on site. Discussion of local problems and provide suggestions and solutions 16 16 6 References Penalty Total (-) 100 CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 Student Id: ______________ Student Name: _______________________________ Assignment Evaluation Grid: Excellent Outstanding (84 – 90) % Task (  91%) Very Good Quality Good Adequate/ (Acceptable) Satisfactory (70-76)% (50-69)% (77-83)% Failed Below 50 SL NO MAX MARKS PROPOSAL - contents & writing 1 2 3 4 Introduction 10 Project / Tasks Description 60 Time Plan 20 Conclusion 10 Penalty Total (-) 100 OBTAINED MARKS CIVIL ENGINEERING CONSTRUCTION 1_CIVL 0003_Spring_2018 I. Proposal - out of 5 II. Report - out of 95 CW Mark - / 100 CW Mark - / 50
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

hello buddyattached is the completed ass...


Anonymous
Just what I needed…Fantastic!

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags