attached is my edited answer (I changed everything related to photovoltaic into concentrated solar plant (CSP) and I only discussed about 50MW output plant in my editions)
Edition for Previous TES Project
Course’s Name
Student’s Name
Professor’s Name
Institution
Due Date
Edition for Previous TES Project
Question 1:
The tables for analysis from the energy plan can be shown as follow:
Parameters
Energy Unit
Value
Parameters
2,500,000 TWh/year V2G Eff Charge
Value
0.9
Capacity Unit
130,000 MW V2G Eff Inv
0.9
Monetary Unit
77,549 DKK eff chp2 el
0.4
21.499 Twh eff chp2 th
0.5
27000 cap hp2 el
0
el demand
RES1 capacity
Name RES1
CSP Solar Power eff hp2 cop
3
Name RES2
Photo Voltaic cap boiler2 th
0
Name RES3
Offshore Wind eff boiler2 th
0.9
Name RES4
River Hydro input cap chp3 el
0
0.023 TWh input eff chp3 el
0.51
input km diesel
1.5 input eff chp3 th
0.45
input km ngas
1.5 cap hp3 el
100
input km biomass
1.5 input eff hp3 cop
3
input km h2
3 input eff hp3 cop
3
input km ev
5 input_cap_boiler3_th
0
input km v2g
5 input_eff_boiler3_th
0.9
input AddExport
V2G MaxShare
V2G Cap Charge
V2G
0.3 input_cap_pp_el
20000
0 input_hydro_cap
0
0.6 input_hydro_eff
0.33
ConnectionShare
nuclear efficiency
0.33 hydro water supply
0
hydro pump
eff_pp_el
eff_dhp_th
0.45 efficiency
0.9 nuclear cap
The figures for analysis from the energy plan can be shown as follow:
The EnergyPLAN model is given by:
0.9
0
And the output from EnergyPLAN is shown below:
Question 2:
The specifications for the solar field can be listed as the last concentrated solar
power system equipment particulars will be controlled by the undertaking engineer in
light of board decision, a diagram of wiring courses of action, and the inverter voltage
input window. The going with is a once-over of apparatus sections and conclusions in
light of current assignment information: 21,740 AMAT line undefined silicon
concentrated solar power of 2.2 x 2.6 meters in 20 x 500 kW subarrays, 20 x 500 kVa
(kW) line-tie control inverters, tallness ascertained 30o settled tilt mount structures that
incorporate racks, wharfs, and footings), and alter of system fragments that comprise gear,
wiring, connectors, combiner boxes, separates, metering and NEC required parts.
Similarly, the specifications for Thermal Energy Storage (TES) can be listed as
the abundance ages open all through low demand periods can be used to charge a TES in
order to fabricate grow the fruitful great age restrict in the midst of request periods. The
result for the concentrated solar power (CSP) system is a higher load factor for the plants,
delivering imperativeness consistently. Standard solicitations of the concentrated solar
power system can be facilitated with the help of TES frameworks that wo...