earlier project edition job

User Generated

zryyvfn

Programming

Description

this is regarding the earlier project edition job you did for me.please dont dissapoint me this time.here is the link where u did the job .https://www.studypool.com/discuss/7614517/earlierr-project-edition-job

Unformatted Attachment Preview

his message "my project is csp and you sent me something on photovoltaic.. and what you sent on modes of operation is incorrect.. I don't understand how can you send something on PV and 10 mw mode of operation which is nothing to do with my project. I specifically asked for CSP plant calculations and clear figures to include in a report that I sent, and you gave me random words and talking about PV which is nothing to do with my project?The files you sent do not contain the answers to most of what I asked for. Also, some things are not even related to my project. My project is Concentrated solar power for a 50MW output plant, and in some places you talk about 10MW and 20MW and photovoltaic." MY REQUEST: I don’t want any excuse this time , if I m not satisfied I will ask for both refunds and I will not rate good like all time. I m telling in advance becoz i am really fed up .
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

attached is my edited answer (I changed everything related to photovoltaic into concentrated solar plant (CSP) and I only discussed about 50MW output plant in my editions)

Edition for Previous TES Project
Course’s Name
Student’s Name
Professor’s Name
Institution
Due Date

Edition for Previous TES Project
Question 1:
The tables for analysis from the energy plan can be shown as follow:
Parameters
Energy Unit

Value

Parameters

2,500,000 TWh/year V2G Eff Charge

Value
0.9

Capacity Unit

130,000 MW V2G Eff Inv

0.9

Monetary Unit

77,549 DKK eff chp2 el

0.4

21.499 Twh eff chp2 th

0.5

27000 cap hp2 el

0

el demand
RES1 capacity
Name RES1

CSP Solar Power eff hp2 cop

3

Name RES2

Photo Voltaic cap boiler2 th

0

Name RES3

Offshore Wind eff boiler2 th

0.9

Name RES4

River Hydro input cap chp3 el

0

0.023 TWh input eff chp3 el

0.51

input km diesel

1.5 input eff chp3 th

0.45

input km ngas

1.5 cap hp3 el

100

input km biomass

1.5 input eff hp3 cop

3

input km h2

3 input eff hp3 cop

3

input km ev

5 input_cap_boiler3_th

0

input km v2g

5 input_eff_boiler3_th

0.9

input AddExport

V2G MaxShare
V2G Cap Charge
V2G

0.3 input_cap_pp_el

20000

0 input_hydro_cap

0

0.6 input_hydro_eff

0.33

ConnectionShare
nuclear efficiency

0.33 hydro water supply

0

hydro pump
eff_pp_el
eff_dhp_th

0.45 efficiency
0.9 nuclear cap

The figures for analysis from the energy plan can be shown as follow:

The EnergyPLAN model is given by:

0.9
0

And the output from EnergyPLAN is shown below:

Question 2:
The specifications for the solar field can be listed as the last concentrated solar
power system equipment particulars will be controlled by the undertaking engineer in

light of board decision, a diagram of wiring courses of action, and the inverter voltage
input window. The going with is a once-over of apparatus sections and conclusions in
light of current assignment information: 21,740 AMAT line undefined silicon
concentrated solar power of 2.2 x 2.6 meters in 20 x 500 kW subarrays, 20 x 500 kVa
(kW) line-tie control inverters, tallness ascertained 30o settled tilt mount structures that
incorporate racks, wharfs, and footings), and alter of system fragments that comprise gear,
wiring, connectors, combiner boxes, separates, metering and NEC required parts.
Similarly, the specifications for Thermal Energy Storage (TES) can be listed as
the abundance ages open all through low demand periods can be used to charge a TES in
order to fabricate grow the fruitful great age restrict in the midst of request periods. The
result for the concentrated solar power (CSP) system is a higher load factor for the plants,
delivering imperativeness consistently. Standard solicitations of the concentrated solar
power system can be facilitated with the help of TES frameworks that wo...


Anonymous
Great content here. Definitely a returning customer.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Related Tags