assigment essay

User Generated

Fpnznpu2

Writing

Description

Task 1:

Submit your project plan. The project plan is a Word document that is a combination of a written explanation of the project plan and the explanation of the control plan. The WBS and timeline are represented with screenshots of the Gantt chart, resource chart, and cost table. Ensure each chart and graph is properly noted and has text explanation.

Note that the course project intent is to introduce students to an entire systems analyst process. Each milestone is fairly significant in size if performing an actual project. For the intended learning and exposure to the course project topics, please know that assumptions will have to be made and that any such assumptions should be documented.

Guidelines and rubrics are attached.

Task 2:

Also, is attached module 2. where we chose the business case proposal that you did. Can we please adjust Module 2 ?

Teacher comment for module 2 was the following:

T 510 Milestone One Guidelines and Rubric feedback: Sandy,

I think this is more of an administrative and managerial issue than it is a technical issue that can be addressed by designing a new system. Please reconsider the problem statement in a way that meets designing requirements.
For example, replacing the existing system of data integration with a web based or cloud system, could be an example.
KB
Problem Statement: Problem statement is not clear. It seems to be more of security issue than something to be addressed by designing a new system.

Unformatted Attachment Preview

IT 510 Milestone Two Guidelines and Rubric You will submit your Project Plan. The project plan is a Word document that is a combination of a written explanation of the Project Plan and the explanation of the Control Plan. The WBS and timeline are represented with screenshots of the Gantt chart, resource chart, and cost table. Ensure each chart and graph is properly noted and has text explanation. Specifically the following critical elements must be addressed: IV. Project Plan: Illustrate your recommended implementation and management strategies. Be sure to include screenshots of all relevant diagrams, charts, and tables. a) Work Breakdown Structure: Describe all of the essential roles and functions required for implementing the solution. Who will be doing the work and what, specifically, will they need to do? b) Project Monitoring and Control Plan: How are you going to ensure that the project is going smoothly? What is your plan of attack to ensure that all controls are adhered to? What is the defined critical path? Be sure that you frame your response for communicating effectively to your target audiences. [ c) Timeline: What is the estimated amount of time for implementation? Create a visual representation that captures your timeline (e.g., Gantt chart) based on the systems development life cycle. Rubric Guidelines for Submission: Milestone Two should follow these formatting guidelines: 2–3 pages, double-spacing, 12-point Times New Roman font, one-inch margins, and citations in APA. Critical Elements Work Breakdown Structure Project Monitoring and Control Plan Exemplary (100%) Meets “Proficient” criteria and selects insightful examples that demonstrate a nuanced assessment of the relationship of IT systems implementation processes Meets “Proficient” criteria and plan reflects an in-depth evaluation of the paradigms, processes, and activities of IT systems Proficient (90%) Describes all of the essential roles and functions required for implementing the solution with specific examples Needs Improvement (75%) Describes the implementation of the solution, but does not include all essential roles and functions or does not include specific examples Not Evident (0%) Does not describe the implementation of the solution Includes a project monitoring and control plan that addresses all necessary controls and defines the critical path in a manner suitable for the target audiences Includes a project monitoring and control plan, but does not address all necessary controls or define the critical path in a manner suitable for the target audiences Does not include a project monitoring and control plan Value 30 30 Timeline Meets “Proficient” criteria and visual representation reflects an in-depth examination of the systems development life cycle Creates a visual representation of an appropriate timeline for implementing the solution based on the systems development life cycle Articulation of Response Submission is free of errors related to citations, grammar, spelling, syntax, and organization and is presented in a professional and easy-to-read format Submission has no major errors related to citations, grammar, spelling, syntax, or organization Creates a visual representation of the timeline for implementing the solution, but it is not fully appropriate based on the systems development life cycle Submission has major errors related to citations, grammar, spelling, syntax, or organization that negatively impact readability and articulation of main ideas Does not create a visual representation of the timeline for implementing the solution 30 Submission has critical errors related to citations, grammar, spelling, syntax, or organization that prevent understanding of ideas 10 Earned Total 100% Running Head: INNOVATIONS AND TECHNOLOGY SOLUTION IN CONSTRUCTION INDUSTRY Innovation and Technology Solutions in Construction Industry Sandy Camacho Professor Brogi Southern New Hampshire University IT 510-Q5193 7/29/18 1 INNOVATIONS AND TECHNOLOGY SOLUTIONS IN CONSTRUCTION INDUSTRY 2 Innovation and Technology Solutions In Construction Industry Introduction Turner construction company is recognized as an international company that has decorated landscape in 60 different countries with world most complex, sophisticated and spectacular buildings which are famous as references on the geographical map. The company has more than 1500 employees in various fields such as engineering and IT experts. Additionally, Turner International offers comprehensive services through designing, development and construction stages of building projects. The company has regional operations based in Europe and central Asia, Middle East, India, South East Asia and Latin America. Turner international company has managed to operate in the global market by developing building designs and construction of the iconic structure those key business accomplishments in the construction industry. Ideally, technology in the construction of the building has widely used mobile devices transformed from handheld to sophisticated gears. Other key innovations and technologies use building construction include Aerogel, transparent aluminum, self-healing concrete, drones, 3D printers and Robotics and virtual reality Background The Internet Age has significantly transformed the building designing and construction industry in term of organization operational and technical expertise. The changes sparked by innovation, invention, and integration of the technology in developing Iconic building designs and application of technology have provided an ideal opportunity for construction industries to meet clients' needs that strictly emphasizes on quality and standardized management processes ( Lee, 2014). The technology in the construction industry is making an enormous impact on the vital sector of the global economy. The world economic forum provides critical insights into the fact INNOVATIONS AND TECHNOLOGY SOLUTIONS IN CONSTRUCTION INDUSTRY 3 that technology is essential in reducing the cost of construction as well as ensuring completion of projects on while improving the quality of building structures. The experts from Cytonn Technologies assert that adoption of innovations such software, application, and platforms credited as game changer supporting the advancement of expertise for a practitioner in the building and construction industry. However, Turner international company recognizes technology innovations in fostering a culture of continuous improvement. The company holds an annual innovation summit aimed at sharing and collaborating to achieve best practices. The innovations are meant to make the company a pacesetter within the construction sector by attaining the great value of the client and partners. Problem Statement The rapid growth of Turner Construction Company is one of the most extensive construction management located in North America. Currently, the company manages approximately 1500 oversee projects annually and employs 5000 experts from different part of the world to work on respective projects (Calder, 2013). Multiple operations and project teams spread in various part of the of the world, effective implantation of the company's progress halted due to bulk data traversing from regional offices. The technologies used such exchanging 3-D print designs, mobile application, internets information and digital solutions for building and construction may face the challenge of losing vital information through secure data storage systems. Additionally, digitization Turner's company infrastructure without appropriated data storage may exposure the company to expose the company operations facing exponential pace at which technology disrupts business due to loss of company information, clients' records, employees information, transaction records through cybercrime activity such unethical hacking companies vital information (Sweeney, 2016). Dealing with large data in a company like Turner INNOVATIONS AND TECHNOLOGY SOLUTIONS IN CONSTRUCTION INDUSTRY 4 International Construction need secure storage that can only be accessible only by authorized staffs. According to Calder (2013), lack of strategic management in protecting company’s virtual assets such electronic information and IT systems may jeopardize customers' trust thus they divert to competitors in building designs and construction industries that meet data security and privacy laws. Additionally, the company must ensure the innovations, clients' information, company documents are stored in secure site such secure socket layer (SSL), backing up data solutions and use of authentication and password to access criminal from stealing private data (Calder, 2013). Audience The target audience for my proposal is the top level management such as CEO in Turner international construction company and IT experts responsible for ensuring the security of data stored. Additionally, the staffs who access and handle the company's information considered as an essential part of strengthening data security. The communication strategies to the audience involve of reminding of the mission statement which is the final goal that business can company look forward to meeting customer satisfaction to ensure information of transaction is safe. Secondly, identify the business objectives that need to hit to successful by having a competitive edge on using innovations and technologies. Finally, a communication channel for disseminating information can work best through Turners International construction company events and news. Additionally, social media can also be a channel to reach out to the prospective audiences. INNOVATIONS AND TECHNOLOGY SOLUTIONS IN CONSTRUCTION INDUSTRY 5 References Calder, A. (2013). A business guide to information security: how to protect your company's IT assets, reduce risks and understand the law. Kogan Page Publishers. Lee, S. (2014, July). Challenges in building design and the construction industry: The future of design and construction in the Internet age. In International Conference Human Society@ Internet (pp. 225-236). Springer, Berlin, Heidelberg. Sweeney, L. (2016). k-anonymity: A model for protecting privacy. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 10(05), 557-570.
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Hi! Hope you are doing good.I had a problem loading my ms pr...


Anonymous
Just the thing I needed, saved me a lot of time.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Content

Related Tags