week 2 needed

User Generated

gurtvsg8

Computer Science

Description

Health Information System Integration for newly-acquired health information system in Happytown. Happytown Medical Center which is a middle-sized hospital

this is week 1 its already done this is just explaining the hole project

Assignment Guidelines

For the assignments in this course, you will be developing a comprehensive Systems Integration Design Proposal as your project. Your first task in this process will be to select an enterprise to use as the basis of your project. You will also create the shell document for the final project deliverable, which you will be working on during each unit. As you proceed through each project phase, you will add content to each section of the final document to gradually complete the final project delivery. Appropriate research should be conducted to support the analysis in your report, and assumptions may be made when necessary.

Following is an outline for the comprehensive design proposal that will evolve throughout the course. This deliverable will be created in incremental steps. For week 1, submit for review by your instructor, the proposal shell and completed Section Headings Project Information, Project Plan, and System Integration Best Practices, labeled week 1. The Requirements Specifications section will be completed and delivered during Week 2, etc.


  • Create the Systems Integration Project Proposal shell.
    • Use Word
    • Title Page
      • Course number and name
      • Project name
      • Your name
      • Date
    • Table of Contents (TOC)
      • Use an autogenerated TOC.
      • This should be on a separate page.
      • Update the fields of the TOC so that it is up-to-date before submitting your project.
    • Section Headings (create each heading on a new page with TBD as content, except for sections listed under New Content below)
      • Project Information (Week 1)
      • Project Plan (Week 1)
      • System Integration Best Practices (Week 1)
      • Requirements Specifications (Week 2)
      • Enterprise System Integration Analysis (Week 3)
      • Systems Integration Approach Evaluation and Selection (Week 3)
      • Proposed System Integration Components Architecture (Week 4)
      • Implementation Framework (Week 4)
      • System Integration Implementation Plan (Week 5)
  • New Content (Week 1)
    • Project Information
      • Provide a brief description of the enterprise (can be hypothetical) where the system integration design proposal has the potential of being adopted.
      • Describe the overall project objectives.
      • List the business or technical needs that will be met by the project.
      • List the major components of the project (major systems that will be integrated).
        • This list may change after further analysis is completed.
      • List the boundaries of the project (what the project will not address).
      • Material can be taken from the approved proposal that you submitted.
      • Be sure that this project is approved by the instructor.
    • Project Plan
      • This contains the work breakdown structure (WBS) for all of the tasks that will be required to complete the project.
      • Determine the start and completion dates (within the course's start and end dates).
      • List other resources that are required to complete the project.
    • System Integration Best Practices
      • Based on what you learned during completion of the Discussion Board activity, identify best practice areas you will cover in your project.
      • Provide a diagram that shows the process flow that you intend to use for designing the systems integration architecture.
  • Make sure that the document is in APA format.

System Integration

Assignment Guidelines

week 2 needs to be done

For this week’s assignment, you will be developing the requirements specification for this integration. You should use all of the tools available to you to elicit requirements (such as one-on-one interviews with all major stakeholders, surveys, artifact reviews, joint requirement specification meetings, and so forth).

  • New Content (Week 2)
    • Requirements Specification
      • Describe the process you used to elicit the requirements.
      • List of all of the stakeholders and their roles.
      • Describe of all components and interfaces, including a schematic that depicts them (such as the various layers of integration).
      • Provide detailed and measurable functional requirements.
      • Provide detailed and measurable nonfunctional requirements.
      • List assumptions for the scope of the project.
      • Discuss the pros and cons of proceeding with the project while giving consideration to the requirements you have defined.
  • Make sure that the document is in APA format.
  • Submit the document for grading.

User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

Attached.

Running head: HEALTH INFORMATION SYSTEM INTEGRATION

Course number and name
Health Information System Integration
Your name
Date

1

HEALTH INFORMATION SYSTEM INTEGRATION

2

Contents
Project Information ......................................................................................................................... 3
Objectives .................................................................................................................................... 3
Business Needs ............................................................................................................................ 4
Major Components and Boundaries ............................................................................................ 5
Project Plan ..................................................................................................................................... 6
System Integration Best Practices ................................................................................................... 7
Requirements Specifications (TBD) ............................................................................................... 8
Enterprise System Integration Analysis (TBD) ............................................................................ 12
Systems Integration Approach Evaluation and Selection (TBD) ................................................. 13
Proposed System Integration Components Architecture (TBD) .................................................. 14
Implementation Framework (TBD) .............................................................................................. 15
System Integration Implementation Plan (TBD) .......................................................................... 16

HEALTH INFORMATION SYSTEM INTEGRATION

3

Project Information
The basic healthcare information system has several functions including the generation of
data, compiling data, analysis and synthesis, and data use. These four functions have been
identified with the newly-acquired health information system in Happytown. Happytown
Medical Center which is a middle-sized hospital with its main facilities in Happytown and has
five other clinics which depend on its health information systems (HIS) for data collection,
analysis, and use. Due to the heterogeneity of the systems available for healthcare information
systems, integration will need the harmonization of data, functions, and workflows to get a
flexible and scalable architecture of the HIS. The following functions are available for the HIS at
Happytown:
1. Electronic medical records for patients,
2. Electronic prescribing,
3. Clinical decision support systems,
4. Computerized provider order entry, and
5. Telehealth
Happytown is a 400-bed facility with five smaller clinics each having a 22-bed capacity
and spread across the state. The identified HIS systems each operate independently since their
installation in the last year. The management of Happytown wishes to bring these systems
together for all clinics such that better management of systems is realized and the benefits as
such also reaped from the same. The expected benefits include the improvement of health quality
and outcomes through a better information flow and interconnectedness of systems which will
serve clients better. The specific objectives of this project are described below.
Objectives

HEALTH INFORMATION SYSTEM INTEGRATION

4

The first objective of this project is to increase the interoperability information systems in
the healthcare organization. This objective wil...


Anonymous
This is great! Exactly what I wanted.

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Content

Related Tags