Reliability 1. (p182-2) A flashlight has 4 components: 2 batteries with reliability of 0.998, a light bulb with reliability of 0.999, and a switch with reliability of 0.997. Determine the reliability of this series system.


2. (p182-6) What is the reliability of the system below, where the reliabilities of components A, B, C, and D are 0.975, 0.985, 0.988, and 0.993, respectively?



3. (p182-15) Construct the life-history curve for the following test data: 4. (p182-22) Construct the OC curve for a sampling plan specified as n = 10, T = 236, c = 4, and r = 5

Unformatted Attachment Preview

ETM 319 Assignment 8 Reliability 1. (p182-2) A flashlight has 4 components: 2 batteries with reliability of 0.998, a light bulb with reliability of 0.999, and a switch with reliability of 0.997. Determine the reliability of this series system. 2. (p182-6) What is the reliability of the system below, where the reliabilities of components A, B, C, and D are 0.975, 0.985, 0.988, and 0.993, respectively? 3. (p182-15) Construct the life-history curve for the following test data: 4. (p182-22) Construct the OC curve for a sampling plan specified as n = 10, T = 236, c = 4, and r = 5.
Purchase answer to see full attachment
User generated content is uploaded by users for the purposes of learning and should be used following Studypool's honor code & terms of service.

Explanation & Answer

...


Anonymous
Very useful material for studying!

Studypool
4.7
Trustpilot
4.5
Sitejabber
4.4

Similar Content

Related Tags