Question 1.1. In a PERT network, the earliest (activity) start time is the (Points : 4) earliest time that an activity can be finished without delaying the entire project. latest time that an activity can be started without delaying the entire project. earliest time that an activity can start without violation of precedence requirements. latest time that an activity can be finished without delaying the entire project. None of the above Question 2.2. PERT and CPM are quantitative analysis tools designed to schedule and control large projects. (Points : 4) True False Question 3.3. The expected time in PERT is (Points : 4) a weighted average of the most optimistic time, most pessimistic time, and four times the most likely time. the modal time of a beta distribution. a simple average of the most optimistic, most likely, and most pessimistic times. the square root of the sum of the variances of the activities on the critical path. None of the above Question 4.4. On a p

Word Count: 1140
Showing Page: 1/7
Saint GBA334 module 7 quizQuestion 1.1.In a PERT network, the earliest (activity) start time is the(Points : 4)earliest time that an activity can be finished without delaying the entire project.latest time that an activity can be started without delaying the entire project.earliest time that an activity can start without violation of precedence requirements.latest time that an activity can be finished without delaying the entire project.None of the aboveQuestion 2.2.PERT and CPM are quantitative analysis tools designed to schedule and control large projects.(Points : 4)TrueFalseQuestion 3.3.The expected time in PERT is(Points : 4)a weighted average of the most optimistic time, most pessimistic time, and four times the mostlikely time.the modal time of a beta distribution.a simple average of the most optimistic, most likely, and most pessimistic times.the square root of the sum of the variances of the activities on the critical path.None of the aboveQuestion 4.4.On a practical note if we are using waiting line analysis to study customers calling atelephone number for service, balking is probably not an issue.(Points : 4)TrueFalseQuestion 5.5.An arrival in a queue that reneges is one who(Points : 4)after joining the queue, becomes impatient and leaves.refuses to join the queue because it is too long.goes through the queue, but never returns.jumps from one queue to another, trying to get through as quickly as possible.None of the aboveQ

Review from student

Studypool Student
" Totally impressed with results!! :-) "
Ask your homework questions. Receive quality answers!

Type your question here (or upload an image)

1829 tutors are online

Brown University





1271 Tutors

California Institute of Technology




2131 Tutors

Carnegie Mellon University




982 Tutors

Columbia University





1256 Tutors

Dartmouth University





2113 Tutors

Emory University





2279 Tutors

Harvard University





599 Tutors

Massachusetts Institute of Technology



2319 Tutors

New York University





1645 Tutors

Notre Dam University





1911 Tutors

Oklahoma University





2122 Tutors

Pennsylvania State University





932 Tutors

Princeton University





1211 Tutors

Stanford University





983 Tutors

University of California





1282 Tutors

Oxford University





123 Tutors

Yale University





2325 Tutors